Hidd City Water Distribution Station 

In support of urban development and housing projects in the Kingdom, the Hidd City Water Distribution Station project was implemented to meet the needs of the Al Hidd Housing Project and surrounding areas, enhancing the efficiency of water supply and ensuring its continuity in line with the growing demand for water.

Project Type: Water Distribution
BD
0
million
Project Budget

Key Project Facts:

Project Overview

Construction of a pumping station and storage tanks with a total capacity of 2.34 million gallons to supply Al Hidd Housing Project and the surrounding areas.

Operating Capacity

The station includes four pumps operating in a 3+1 configuration to distribute water through the network. Each pump can supply up to 390 cubic meters of water.

Technical Features

Equipped with the latest electrical, mechanical, and control systems, along with advanced devices for water monitoring and quality measurement. Main equipment is supported by a Redundancy system to ensure operational reliability.

Project Budget

Funded by the Saudi Fund for Development with a total budget of BD 6.7 million.

Project Milestone

The station has been operational since April 2024.