Future Projects
Hamala Reverse Osmosis Water Production Plant
EWA is planning the construction of a New Brackish Water Reverse Osmosis (BWRO) Production Plant at the existing Hamala Ground Forwarding Station. This facility is designed to produce 10 million Gallons of Potable Water daily from Brackish groundwater, enhancing Bahrain's water supply capabilities.
Project Type: Water Production & Transmission & Distribution
Key Project Facts:
Project Overview
EWA is developing a state-of-the-art Reverse Osmosis (RO) Water Production Plant at the Hamala Ground Forwarding Station.
Production Capacity
The facility is designed to produce 10 Million Gallons of Potable Water per day (MIGD) from brackish groundwater, enhancing Bahrain's water supply infrastructure.
Infrastructure Upgrade
A new Forwarding and Distribution Station will replace outdated infrastructure, ensuring efficient and reliable water distribution while minimizing losses.
Water Security
The plant will address the rising water demands of Bahrain's growing population and contribute to the kingdom's long-term water security goals.
Sustainability Goals
Incorporates the latest environmental compliance technologies, including energy-efficient systems to reduce carbon footprint and operational costs.