Our Projects
Future Projects 2028

New Independent Power and Water Project (IPWP) at Sitra 

EWA, in partnership with the private sector, is preparing to develop a new Independent Power & Water Project (IPWP) in Sitra. This initiative aims to enhance the Kingdom's power and water infrastructure to accommodate the increasing demand, in line with the Master Plan 2030.

Project Type: Power & Water Production
0
MW
Power Production
0
MIGD
Water Production

Key Project Facts:

Project Overview

Develop a new IPWP in Sitra to expand the Electricity and Water infrastructure, aligning with the master plan 2030.

Strategic Objectives

Enhance energy efficiency and reduce natural gas consumption using advanced, low-emission, state-of-the-art technology.

Infrastructure Development

Combined Cycle dual fuel power facility with 1,200 MW capacity, and a seawater reverse osmosis desalination facility producing 30 MIGD of potable water.

Operational Timeline

Early Commercial Operation Date (ECOD) by Q2 2028 with 600 MW, reaching full capacity of 1,200 MW by Q2 2029 (COD). Water production of 30 MIGD is also expected by Q2 2028 (COD).